If your home has cedar shakes and shingles you re going to create an exceptional look with vertical cedar siding.
Installing vertical cedar channel siding.
For horizontal applications start with the bottom course and work up with the channels pointing upwards.
Lately we are seeing more channel lap vertical applications.
4 weeks standard color 5 weeks custom color whether used as an accent or as cladding on an entire home nucedar mills three vertical siding styles are designed to capture the historic character and rustic charm of architectural designs while offering an extended level of durability low maintenance and ease of installation.
Install your corner posts even with or slightly below that chalk line.
Ensure joints meet on studs blocking or furring strips with the nail penetrating solid wood at least 1 1 4 inches.
To establish the vertical starting base use a chalk line and a level to obtain a horizontal starting point so that all installed siding will be perfectly level.
Do not nail through overlaps.
The one aspect with cedar siding to remember is that it is wood product and needs to be handled with some specific care.
When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
2 minutes cedar siding is a beautiful addition to any home adding character and charm.
Lap siding can be installed horizontally or vertically.
This is a variant on the new shadaw gap narrow 1 4 shadow line profile that is popular now.
Features of recommended nails.
Tips on installing cedar siding.
If you choose to install channel siding vertically be sure to bevel cut the ends and install so water is directed to the outside.
Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried.
A vapor barrier is also recommended with cedar siding.
For instance even though cedar is naturally resistant to moisture and to the elements in general which makes it the ideal natural siding material it is still sensitive.
The dupont tyvek drainwrap is a quality barrier with built in channels to channel away excess water.
Furring strips must be thick enough to allow for nail penetration of 1 1 4 in into solid wood with ring shank nail table 4.
For a quality installation it s important to install the cedar siding according to western red cedar lumber association guidelines.
Yes we re aware that cedar is also a wood but it is in such demand that it deserves its own section.
Your j channel should extend into corner post and always remember to allow a 1 4 for expansion.